{"id":6790,"date":"2025-02-20T01:37:06","date_gmt":"2025-02-20T01:37:06","guid":{"rendered":"https:\/\/iszf.irk.ru\/?p=6790"},"modified":"2025-10-22T08:28:45","modified_gmt":"2025-10-22T08:28:45","slug":"iszf-poluchil-polozhitelnoe-zaklyuchenie-glavgosekspertizy-po-inzhenernym-izyskaniyam-dlya-stroitelstva-lidara-i-nagrevnogo-stenda","status":"publish","type":"post","link":"https:\/\/iszf.irk.ru\/en\/news\/iszf-poluchil-polozhitelnoe-zaklyuchenie-glavgosekspertizy-po-inzhenernym-izyskaniyam-dlya-stroitelstva-lidara-i-nagrevnogo-stenda\/","title":{"rendered":"ISTP RECEIVES APPROVAL FROM GLAVGOSEXPERTIZA ON THE ENGINEERING SURVEY RESULTS FOR LIDAR AND HEATING FACILITY CONSTRUCTION"},"content":{"rendered":"<p>The Institute of Solar-Terrestrial Physics SB RAS has obtained a positive assessment from Glavgosexpertiza of Russia confirming that the results of the engineering surveys comply with the technical regulations for the upcoming construction of lidar and heating facility. These structures will be built as part of the expanded investment project \"National Heliogeophysical Complex of RAS (NHC RAS).<\/p>\n\n\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/iszf.irk.ru\/wp-content\/uploads\/2025\/02\/lidar-1024x576.jpg\" alt=\"\" class=\"wp-image-6791\" srcset=\"https:\/\/iszf.irk.ru\/wp-content\/uploads\/2025\/02\/lidar-1024x576.jpg 1024w, https:\/\/iszf.irk.ru\/wp-content\/uploads\/2025\/02\/lidar-300x169.jpg 300w, https:\/\/iszf.irk.ru\/wp-content\/uploads\/2025\/02\/lidar-768x432.jpg 768w, https:\/\/iszf.irk.ru\/wp-content\/uploads\/2025\/02\/lidar-18x10.jpg 18w, https:\/\/iszf.irk.ru\/wp-content\/uploads\/2025\/02\/lidar.jpg 1152w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>","protected":false},"excerpt":{"rendered":"<p>The Institute of Solar-Terrestrial Physics SB RAS has obtained a positive assessment from Glavgosexpertiza of Russia confirming that the results of the engineering surveys comply with the technical regulations for the upcoming construction of lidar and heating facility. These structures will be built as part of the expanded investment project \"National Heliogeophysical Complex of RAS (NHC RAS).<\/p>","protected":false},"author":1,"featured_media":7947,"comment_status":"closed","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[156],"tags":[],"class_list":["post-6790","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-istp"],"_links":{"self":[{"href":"https:\/\/iszf.irk.ru\/en\/wp-json\/wp\/v2\/posts\/6790","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/iszf.irk.ru\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/iszf.irk.ru\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/iszf.irk.ru\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/iszf.irk.ru\/en\/wp-json\/wp\/v2\/comments?post=6790"}],"version-history":[{"count":4,"href":"https:\/\/iszf.irk.ru\/en\/wp-json\/wp\/v2\/posts\/6790\/revisions"}],"predecessor-version":[{"id":9670,"href":"https:\/\/iszf.irk.ru\/en\/wp-json\/wp\/v2\/posts\/6790\/revisions\/9670"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/iszf.irk.ru\/en\/wp-json\/wp\/v2\/media\/7947"}],"wp:attachment":[{"href":"https:\/\/iszf.irk.ru\/en\/wp-json\/wp\/v2\/media?parent=6790"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/iszf.irk.ru\/en\/wp-json\/wp\/v2\/categories?post=6790"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/iszf.irk.ru\/en\/wp-json\/wp\/v2\/tags?post=6790"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}